Understand the demand before the equipment
List the appliances and essential loads you want the system to support. Lights, refrigeration, office equipment and larger appliances have different demands, so include how long each needs to run. Your priorities matter more than choosing a system by the number of panels.
Roof space, shading, the existing electrical installation and any equipment already on site are all relevant. A site assessment and a clear picture of the load are needed before system capacity, batteries or a final installation scope can be confirmed.

Bring solar into the property plan
If you are building or renovating, mention solar early. Equipment locations, cable routes and roof access can then be planned alongside the building work and the wider engineering scope. For an existing property, share photographs of the roof and possible installation areas, taken safely and without opening any electrical enclosures.
Your quotation sets out the proposed components, installation responsibilities and handover information. Costs, expected performance and equipment warranties depend on the system proposed. No single package suits every property, so performance and savings are only discussed once the design has been assessed.
Where we offer solar installations
Godrock takes on solar installations projects throughout Zimbabwe, from our head office in Harare, and throughout Mozambique, from our office in Nacala.



